Ameren Illinois Construction and Engineering Services   Phone: 888.659.4540   Fax: 217.424.6758
   
Construction Request Form
 
Construction wait times for 'standard designs' are typically:   Permanent Electric & Gas Service - Once Ameren has determined that your job site is ready your request should be completed within 12 working days.
Temporary Electric (OH or UG) - 3 days.
 
Non-standard designs require a meet with a field representative.   

Please complete all information and place additional comments in the space provided. Click Submit to forward your request to Ameren Illinois Construction and Engineering Services.

* Required entry
General Information
Today's Date: 04/17/2014
*Company Name:
*Billing Address:
*City:
*State:
*Zip Code:
*Contact Name:
*Contact E-mail:
*Contact Phone:
Fax:
Cell:
Pager:
Service Type (Choose All that apply)
*
Site Information
*Type of Request:
*Structure Type:   No. of Units:  
*Address:
*City:
*State:
*Zip Code:
*Nearest Cross Street:
Subdivision Name:
Lot #:
If not in a subdivision, provide directions to site from major landmark/intersection:
*Backfilled at foundation?
*Lot within 6" of final grade?
*Will there be obstructions in path of service? Driveways, sidewalks, trees, etc?
Temporary Electric Service Information
Date Service Ready:
Once Ameren has determined that your job site is ready, your request should be completed in 3 days
Amp Size:
Phase:
Approximate distance from pole/transformer/pedestal to meter base:  feet
Temporary Service WILL BE DISCONNECTED when permanent service is installed.
Permanent Electric Service Information
Date Service Ready:
Once Ameren has determined that your job site is ready your request should be completed within 12 working days.
Amp Size:
Phase:
Will the primary heat source be electric?


Approximate distance from pole/transformer/pedestal to meter base:  feet
Mark location of Service:
5   6


Rear
 
Building or House
 
Front


2   1

 
Street

Is electrical inspection needed?
Is electrical inspection done? 
Date inspection will be completed?
Gas Service Information
Date Service Ready:
Once Ameren has determined that your job site is ready your request should be completed within 12 working days.
Approximate distance from property line to gas meter location:  feet
Load Information:
Total BTU Load (if known):
Square footage of building:
Enter number of each GAS consuming appliance(s) this new business/home will have.
Furnace: Stove: Dryer:
Water Heater: Jacuzzi/Hot Tub: Fireplace/Gas Logs:
Mark location of Service:
5   6


Rear
 
Building or House
 
Front


2   1

 
Street

Additional Comments (if any):
 
 
Follow Us