Ameren Illinois Construction and Engineering Services   Phone: 888.659.4540   Fax: 217.424.6758
   
Construction Request Form
 
Construction wait times for 'standard designs' are typically:   Permanent Electric & Gas Service - Once Ameren has determined that your job site is ready your request should be completed within 12 working days.
Temporary Electric (OH or UG) - 3 days.
 
Non-standard designs require a meet with a field representative.   

Please complete all information and place additional comments in the space provided. Click Submit to forward your request to Ameren Illinois Construction and Engineering Services.

* Required entry
General Information
Today's Date: 12/22/2024
*Company Name:
*Billing Address:
*City:
*State:
*Zip Code:
*Contact Name:
*Contact E-mail:
*Contact Phone:
Fax:
Cell:
Pager:
Service Type (Choose All that apply)
*
Site Information
*Type of Request:
*Structure Type:
  No. of Units:  
*Address:
*City:
*State:
*Zip Code:
*Nearest Cross Street:
Subdivision Name:
Lot #:
If not in a subdivision, provide directions to site from major landmark/intersection:
*Backfilled at foundation?
*Lot within 6" of final grade?
*Will there be obstructions in path of service? Driveways, sidewalks, trees, etc?
Temporary Electric Service Information
Date Service Ready:
Once Ameren has determined that your job site is ready, your request should be completed in 3 days
Amp Size:
Phase:
Approximate distance from pole/transformer/pedestal to meter base:  feet
Temporary Service WILL BE DISCONNECTED when permanent service is installed.
Permanent Electric Service Information
Date Service Ready:
Once Ameren has determined that your job site is ready your request should be completed within 12 working days.
Amp Size:
Phase:
Will the primary heat source be electric?
Approximate distance from pole/transformer/pedestal to meter base:  feet
Electric meter should be installed on same side as Ameren facilities; not to exceed mid-point of house. Install metering equipment per Ameren specs, NEC and local codes if subject to inspection.
Mark location of Service:


Rear
 
Building or House
 
Front



 
Street

Is electrical inspection needed?
Is electrical inspection done? 
Date inspection will be completed?
Gas Service Information
Date Service Ready:
Once Ameren has determined that your job site is ready your request should be completed within 12 working days.
Approximate distance from property line to gas meter location:  feet
Load Information:
Total BTU Load (if known):
Square footage of building:
Enter number of each GAS consuming appliance(s) this new business/home will have.
Furnace: Stove: Dryer:
Water Heater: Jacuzzi/Hot Tub: Fireplace/Gas Logs:
Locate the gas meter within 2 - 5 feet of front of building.
The gas regulator relief vent requires at least a 3 feet radial clearance from
- any electric meter
- air conditioning condensing unit
- electrical outlet
- electrical disconnect
- other potential source of ignition
(For further details see the Ready for Service brochure)
Mark location of Service:
Rear
 
Building or House
 
Front

 
Street

Note: All customer gas piping, fittings, valves and utilization equipment must meet the specifications of
and be installed in accordance with the National Fuel Gas Code (NFPA54) or applicable local codes.
Additional Comments (if any):
 
 
Follow Us twitter